NVIDIA
NVIDIA A100 80GB SXM
Ampere · 80 GB HBM2E · AI training / inference / HPC
Up to 7 MIG instances.
Loading
ComputeCrusoe CloudOFR-0670
NVIDIA A100 80GB SXM from Crusoe Cloud in Virginia, United States, listed as “a100-80gb-sxm-ib.8x”.
Recorded commercial and technical data. Reconfirm current price and capacity before procurement.
At a glance
Original listed price and Kovara’s normalized comparable rate are kept separate.
Comparable rate
$2.30USD / GPU-hour · normalized by Kovara
Listed as USD 18.40 per instance-hour
Not yet recorded Minimum Term · Available From · Reservation Fee · Minimum Spend · SLA · Support Tier · Support Model · Deployment Lead Time · Commercial Terms · Support Resource
Take a sourced brief to Crusoe Cloud and confirm there. Kovara does not launch or bill capacity.
Last checked 29 Sept 2026. Price and availability may have changed since; treat the brief as a starting point.
Kovara does not launch, reserve or bill this capacity, and a catalogue record is not a quote or a guarantee of stock. You deploy with Crusoe Cloud under your own account and terms.
# Kovara offering brief
# Generated 2026-10-19T16:38:54.197Z. Values are catalogue records, not a reservation or a quote.
# Reconfirm price and availability with the provider before you commit.
kovara:
offering_id: "OFR-0670"
provider:
id: "PRV0003"
name: "Crusoe Cloud"
url: "https://www.crusoe.ai/cloud/pricing"
gpu:
id: "GPU0013"
name: "NVIDIA A100 80GB SXM"
vram_gb: 80
region:
id: "REG0054"
name: "Virginia"
country: "United States"
requested_gpus: 8
terms:
deployment_type: "GPU instance"
contract_type: "On-Demand"
billing_model: "GPU-hour"
minimum_term_months: null
price:
original:
value: 18.4
currency: "USD"
unit: "instance-hour"
normalized_usd_per_gpu_hour: 2.3
availability:
status: "Available in documented zone"
recorded_gpu_count: null
evidence:
confidence_grade: "A"
last_checked: "2026-09-29T05:07:36.393894+00:00"
Yes and No are recorded values. Not verified means Kovara does not hold a reviewed value.
Canonical hardware registry fields for this accelerator.
NVIDIA
Ampere · 80 GB HBM2E · AI training / inference / HPC
Up to 7 MIG instances.
Provider
Crusoe provides vertically integrated AI infrastructure, including energy-aware data centers and a scalable AI cloud platform.
Not yet recorded Parent Company
Region
Regional map coordinate added for Virginia geographic context; not an exact datacenter location.
No provider data-residency constraint is published for this region.
Compute spend per nameplate GPU kWh: $5.75.
Hourly compute price divided by GPU nameplate power. This comparison excludes host and cooling energy and is not a measured energy cost.2 public price observations · 0 capacity observations
| Observed | Price | Normalized | Type | Confidence |
|---|---|---|---|---|
| 29 Sept 2026, 05:07 UTC | USD 18.40instance-hour | $2.30 / GPU-hr | Public List Price | Grade A |
| 23 Sept 2026, 00:39 UTC | USD 18.40instance-hour | $2.30 / GPU-hr | Public List Price | Grade A |
Public evidence supporting this market record. Source reliability is distinct from offering confidence.
A recorded grade does not certify every field or confirm current capacity.
Kovara confirms current price, capacity and terms with the provider before anything is committed.
Not yet recorded City / Metro · Data Residency · Electricity Market
No verified public capacity observations are currently recorded for this offering.
Where this compute physically sits, at the most precise level supported by public evidence.
No public physical-location relationship. Kovara does not infer an exact building from a Provider region. A facility, campus or metro will appear here only when supported and authorized for publication.
Open Data Center Atlas →