Benchmark performance not appliedBenchmark performance is not applied until a model family or explicit comparison group is selected.
PERFORMANCE EVIDENCEComparable benchmark basis
Benchmark performance is not applied until a model family or explicit comparison group is selected.
Read the evidence methodology →No benchmark group is active. Market-price economics still work, but Kovara will not invent performance normalization.
LEADING CURRENT SCENARIODigitalOcean
NVIDIA H100 SXM · Amsterdam, Netherlands
Partial economicsTracked GPU price$4.41USD / GPU-hour
Storage$0.00
Interconnect$0.00
Modeled totalIncomplete730 billed hours/GPU
Effective utilized GPU-hourIncomplete75% utilization
Workload cost / 1M tokensIncomplete760.9M tokens
Performance $ / 1M tokensIncompletePerformance unavailable
Evidence score89/100Completeness + freshness
SCENARIO COMPARISONCurrent economic paths
Ranking objective: Balanced economics. Evidence score is a modeling completeness / freshness indicator, not a probability.
29 viable01

DigitalOceanNVIDIA H100 SXM · Amsterdam, NetherlandsOFR-0642
GPU price$4.41
TotalIncomplete
EffectiveIncomplete
Perf $/1M tokIncomplete
Evidence89/100
Inspect →02

Crusoe CloudNVIDIA H100 SXM · Iceland, IcelandOFR-0662
GPU price$3.90
TotalIncomplete
EffectiveIncomplete
Perf $/1M tokIncomplete
Evidence85/100
Inspect →03

DigitalOceanNVIDIA H100 SXM · Amsterdam, NetherlandsOFR-0641
GPU price$4.41
TotalIncomplete
EffectiveIncomplete
Perf $/1M tokIncomplete
Evidence84/100
Inspect →04

Microsoft AzureNVIDIA H100 NVL 94GB · Frankfurt, GermanyOFF000147
GPU price$9.07
TotalIncomplete
EffectiveIncomplete
Perf $/1M tokIncomplete
Evidence79/100
Inspect →05

Microsoft AzureNVIDIA H100 NVL 94GB · Ireland, IrelandOFF000154
GPU price$8.38
TotalIncomplete
EffectiveIncomplete
Perf $/1M tokIncomplete
Evidence79/100
Inspect →06

Microsoft AzureNVIDIA H100 NVL 94GB · Madrid, SpainOFF000157
GPU price$9.07
TotalIncomplete
EffectiveIncomplete
Perf $/1M tokIncomplete
Evidence79/100
Inspect →07

Microsoft AzureNVIDIA H100 NVL 94GB · Gävle, SwedenOFF000158
GPU price$9.07
TotalIncomplete
EffectiveIncomplete
Perf $/1M tokIncomplete
Evidence79/100
Inspect →08

Microsoft AzureNVIDIA H100 NVL 94GB · Zurich, SwitzerlandOFF000159
GPU price$9.98
TotalIncomplete
EffectiveIncomplete
Perf $/1M tokIncomplete
Evidence79/100
Inspect →09

Microsoft AzureNVIDIA H100 NVL 94GB · London, United KingdomOFF000161
GPU price$8.72
TotalIncomplete
EffectiveIncomplete
Perf $/1M tokIncomplete
Evidence79/100
Inspect →10

Microsoft AzureNVIDIA H100 NVL 94GB · Cardiff, United KingdomOFF000162
GPU price$9.14
TotalIncomplete
EffectiveIncomplete
Perf $/1M tokIncomplete
Evidence79/100
Inspect →11

Microsoft AzureNVIDIA H100 NVL 94GB · Netherlands, NetherlandsOFF000163
GPU price$9.08
TotalIncomplete
EffectiveIncomplete
Perf $/1M tokIncomplete
Evidence79/100
Inspect →12

Microsoft AzureNVIDIA H100 NVL 94GB · Frankfurt, GermanyOFF000256
GPU price$9.07
TotalIncomplete
EffectiveIncomplete
Perf $/1M tokIncomplete
Evidence79/100
Inspect →SENSITIVITYWhat changes the economics?
Recalculates the selected scenario under simple price and utilization shocks. It does not predict future prices.
DigitalOceanPrice −10%Incomplete$3.97/GPU-h · 75% utilization · effective Incomplete/used GPU-h
Current scenarioIncomplete$4.41/GPU-h · 75% utilization · effective Incomplete/used GPU-h
Price +10%Incomplete$4.85/GPU-h · 75% utilization · effective Incomplete/used GPU-h
Utilization −15 ptsIncomplete$4.41/GPU-h · 60% utilization · effective Incomplete/used GPU-h
Utilization +10 ptsIncomplete$4.41/GPU-h · 85% utilization · effective Incomplete/used GPU-h
EVIDENCE LAYERWhat is measured, modeled and missing
The economics model does not collapse these categories into a single claim.
OFR-0642TRACKED- Comparable USD / GPU-hour price is tracked on the current public Offering.
- Accelerator VRAM is tracked at 80 GB per GPU.
- Compute cost is calculated from tracked hourly price × requested GPU quantity × billed hours.
- Known cost subtotal: $25,754.40. This excludes unpriced components and is not a complete total.
- Network bandwidth metadata is tracked at 25 Gbps.
- Local storage capacity is tracked at 2,046 GB; storage price is not inferred.
ASSUMPTIONS- Billed planning month is 730 hours unless the workload uses an explicit run duration.
- Utilization assumption is 75.0%.
- No egress volume was requested, so egress cost is excluded from the scenario.
- This scenario models compute commitments, requested egress, storage, setup, interconnect and entered overhead; taxes and unlisted charges require contract review.
MISSING / NOT INFERRED- Minimum term is undisclosed; no complete contractual total is claimed.
- Setup fee is undisclosed or invalid; it is not assumed to be zero.
- No applicable public comparable performance benchmark or explicit throughput assumption is available.